COLLECTION 1.0 / INSTALLATION AND FIRST-PLAY CHECK

Release status: published design, ready for venue fit-up and playtesting.
The plans are not proof of competitive balance or a complete venue specification.
All five retain 50 bunkers, mirrored ends and the same product inventory.

INITIAL RELEASE 1.0
Crossroads: move both D3 bunkers away from the upper midfield brick.
Switchback: widen the upper lane and lower snake-support gaps.
Citadel: separate the upper support cake from the forward Dorito.
Splitline: widen the lower Dorito/midfield-brick gap.
Orbit: move lower Mini W supports away from the curved snake.
Use the 1.0 coordinates; older versions are superseded.

GEOMETRY AUDIT
Four feet is a chosen movement-spacing target, not a regulatory safety standard.
Distances below are between rectangular ground envelopes, excluding pairs of
snake components. Dorito envelopes remain provisional 8 x 8 ft placeholders.
Citadel: minimum separate-bunker bounding-box gap 4.00 ft (A-D2 / A-M2).
Switchback: minimum separate-bunker bounding-box gap 4.67 ft (A-IP / A-L1).
Crossroads: minimum separate-bunker bounding-box gap 4.83 ft (A-D3 / 50-U).
Orbit: minimum separate-bunker bounding-box gap 5.15 ft (A-M2 / A-U2).
Splitline: minimum separate-bunker bounding-box gap 4.00 ft (A-D2 / A-D3).

BEFORE STAKING
1. Obtain actual Small Dorito base width/depth; the manufacturer's listing does
   not supply them. Replace the placeholder envelopes and recheck clearances.
2. Resolve Tall Can height: title says 6 ft, product details say 6.5 ft.
3. Confirm the venue's surface, netting, external clearances, anchoring and
   inflation setup with the operator and equipment suppliers.
4. Use the CSV for all 50 centers and angles. Bricks, Aztecs and Mini Ws have
   published width along X, as drawn. Match that orientation on both ends.
5. Inflate snake pieces, fit junctions and mirror any adjustments. Rounded
   fabric and anchors are not represented by the nominal envelope drawings.

FIRST FIELD SESSION
Walk every opening route and both sides of each bunker with the operator.
Check actual muzzle-height views: a top-down plan cannot establish shot lanes.
Run at least 20 trial points with teams alternating ends; include different
skill levels and swap the teams so team strength is not mistaken for end bias.
Log: map/version, teams, starting ends, point duration, first elimination time,
first position reached, winning end, used/unused positions and stalled phases.
Record positions that are unreachable, dominate several routes without a
counter, or cause repeated stalls. Adjust one mirrored pair at a time, then
repeat the affected scenarios. Twenty points is a practical starting sample,
not statistical proof of balance. Avoid promising a target match duration
until real play produces measurements.

INSTALLED-FIELD RECORD
Venue: __________________  Map/version: __________________
Date: ___________________  Operator: _____________________
Confirmed Dorito base: __________  Confirmed Can height: __________
Inflated junction adjustments: ___________________________________
Observed movement or sightline issues: ___________________________
Next geometry revision, if needed: _______________________________

Keep the published catalog, coordinate CSV, SVG and PDF at the same version.